Holcim – Lighter Construction

Holcim was using a 2-ply 90+90g/m2 construction for their 50kg cement sack market.

"Their objective was to achieve a “lighter” construction without affecting the strength and filling processes".

BillerudKorsnäs Sack Lab accepted the challenge and analysed the packaging performance of the current sack and recommended a new sack construction with high quality sack papers from BillerudKorsnäs.

See also

Sack Solutions

Minimise waste, maximise profits. Read more.
*except love

Nothing* should last forever neither should packaging

Four billion tonnes of waste are produced in the world every year and plastic particles can be found in all our oceans.

How much air do you ship across the ocean?

Discover savings hidden in your supply chain.